A level gives a horizontal line of sight. Staff readings taken along it give the reduced level (RL) of each point relative to a benchmark.
Readings in a level book
- Back sight (BS): first reading after setting up, usually on a point of known RL.
- Fore sight (FS): last reading before moving the instrument.
- Intermediate sight (IS): anything in between.
- Change point (CP): a point with both an FS and the next BS.
Height of instrument (HI) method
HI = RL of point + BS RL = HI − (IS or FS)
Check: ΣBS − ΣFS = Last RL − First RL
Quick, good for many intermediate sights such as longitudinal sections and contouring. The check does not test the intermediate RLs.
Rise and fall method
Compare each reading with the one before: if the new reading is smaller, the ground has risen.
Rise = previous reading − current reading (if positive)
Checks: ΣBS − ΣFS = ΣRise − ΣFall = Last RL − First RL
Slower, but every RL is checked, so it suits precise work such as fixing benchmarks.
Worked example (HI method)
| Point | BS | IS | FS | HI | RL |
|---|---|---|---|---|---|
| BM | 1.525 | 101.525 | 100.000 | ||
| A | 2.110 | 99.415 | |||
| CP1 | 0.985 | 1.870 | 100.640 | 99.655 | |
| B | 2.240 | 98.400 |
ΣBS − ΣFS = 2.510 − 4.110 = −1.600
Last RL − First RL = 98.400 − 100.000 = −1.600 ✓
Common errors
Staff not vertical, bubble not centred, parallax, and reading the staff upside down. Keeping back sight and fore sight distances equal cancels collimation error and most curvature and refraction.
Our earthwork tool imports a level book in either format and runs these checks for you.
Quick check
In the height of instrument method, the arithmetic check is: